四虎国产精品永久在线网址_一级无遮挡毛片免费视频_日本品爱网在线观看_亚洲日韩精品波多野结衣_久久国产精品波多野结衣_免费无遮挡又黄又爽网站_國產女人倫碼一區二區三區不卡_四虎最新更新影片资源._aaa精品在线免费视频_有码无码日韩中文字幕

150-5380-1111

信息詳情 Information

MH electric hoist gantry crane

2022-4-6 14:09:04
一鍵分享:

微信圖片_201907131159411.jpg

MH electric hoist gantry crane

1. MH electric hoist gantry crane is a light gantry crane in open air and windy areas. It has two operation modes: air operation and ground operation. Lifting capacity gn=2t-20t, span 10m-30m, working environment below +40 ℃, working level 25%, wind pressure not greater than 125pa.

2. Technical features: the transmission adopts a new generation of three in one system, the electrical appliance adopts contactless module speed regulation control, and can realize micro speed and double speed approaching frequency conversion functions, so that the operation and lifting inching performance are particularly stable. It is equipped with overload alarm, inclined lifting, anti hook top impact secondary protection, missing item overcurrent and other protection, and the console (handle) adopts 12V voltage to realize the multi-functional protection of hoist door crane from the surface. When the voltage is within 380V + 5~-10%, the electric control can be used for "2million" times for a long time.

3. Selection principle: use industry, starting and inching times /1h The practical time per day is h, which must be indicated: light crane, starting and inching are gn/0-80 times /1h, gn/2- 40 times /1h, gn/1-15-20 times /h, high temperature 50 ℃ and harsh environment times /1h ÷ 2.

4. Precautions:

① At the operation site, when the crane stops working, the user should lock the crane in time.

② There is no wire above the main switch of this crane. It is strictly prohibited to lift high-temperature molten liquid, flammable, explosive, corrosive, overloaded, dust and other dangerous operations.

③ The total length of the outer suspension of the gantry crane is less than 1/3 of the midspan 90% of GN at the outer suspension limit, and the crane can run only when the weight is moved into the outrigger. The weight GN that must be operated by the crane outside the leg shall be reduced by 10-20%. When the external suspension exceeds 1/3 of the midspan, GN shall be reduced by sections. Under the above conditions, the weight can only be operated when it is close to the outrigger crane. Small spans should not be run outside the legs.